RicaoraRicaora
CHARGING TIME AND COST

Alpine A290

Choose your version and where to charge. Then calculate charging time and cost with your car already selected.

4 versions≈ 52 kWh in the catalogueSources for every version

Set up your charging session

Choose a version to see its charging limits and continue.

In the calculator you can change percentages, power, tariff and conditions. For a household socket, ask a qualified professional to check that the installation is suitable for EV charging.

How much does charging cost?

Compare batteries using your tariffs. Initial values of 0.30 and 0.65 €/kWh are examples, not offers or market averages.

Supply energy = usable capacity × charge change ÷ (1 − losses). Costs cover energy only, excluding subscriptions and other charges. Actual losses vary with power, installation and temperature.

Example from 20–80%, with assumed losses of 10%.

Session energy and cost for each battery
VersionEstimated supply energyHomePublic
A290 GT 52 202534.67 kWh10.40 €22.53 €
A290 GT Performance 52 202534.67 kWh10.40 €22.53 €
A290 GT Premium 52 202534.67 kWh10.40 €22.53 €
A290 GTS 52 202534.67 kWh10.40 €22.53 €
Technical data and sources Versions, AC tables and DC references

Versions and technical data

Check your version's year and equipment. Specifications, indicative tables and sources are listed here.

Some capacities are indicative. Version notes distinguish documented values from estimates.

A290 GT 52 2025Italy · 2025 · configuration and data from the indicated source · Documented data with indicative values
Indicative usable capacity
≈ 52 kWh
Maximum AC power
11 kW
Maximum DC power
100 kW
Nominal/gross capacity
Unverified
Declared WLTP range
380 km
Declared WLTP consumption
15.8 kWh/100 km
Motor and drivetrain
130 kW · Front
Documented configuration
2025
Market status
Model marketed in Italy

Model in the Italian range. Configuration year and equipment are identified; WLTP data and times vary with equipment and conditions.

Declared AC WLTP consumption includes charging energy: do not add losses again. It is a homologation value, not a prediction of road consumption.

EV Database reports a 52 kWh usable reference; the Alpine brochure states 52 kWh without distinguishing gross and net. Capacity is documented but not confirmed as net by the manufacturer. 2025 brochure range; MY26 configurator WLTP figures are not applied to these configurations.

AC charging time from 20–80%

Energy stored in this window is approximately 31.2 kWh. With 10% losses, estimated supply energy is 34.7 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW15 h 05 min
3.7 kW3.7 kW9 h 23 min
7.4 kW7.4 kW4 h 42 min
11 kW11 kW3 h 10 min
22 kW11 kW3 h 10 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 15–80% in 30 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

A290 GT Performance 52 2025Italy · 2025 · configuration and data from the indicated source · Documented data with indicative values
Indicative usable capacity
≈ 52 kWh
Maximum AC power
11 kW
Maximum DC power
100 kW
Nominal/gross capacity
Unverified
Declared WLTP range
364 km
Declared WLTP consumption
16.5 kWh/100 km
Motor and drivetrain
160 kW · Front
Documented configuration
2025
Market status
Model marketed in Italy

Model in the Italian range. Configuration year and equipment are identified; WLTP data and times vary with equipment and conditions.

Declared AC WLTP consumption includes charging energy: do not add losses again. It is a homologation value, not a prediction of road consumption.

EV Database reports a 52 kWh usable reference; the Alpine brochure states 52 kWh without distinguishing gross and net. Capacity is documented but not confirmed as net by the manufacturer. 2025 brochure range; MY26 configurator WLTP figures are not applied to these configurations.

AC charging time from 20–80%

Energy stored in this window is approximately 31.2 kWh. With 10% losses, estimated supply energy is 34.7 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW15 h 05 min
3.7 kW3.7 kW9 h 23 min
7.4 kW7.4 kW4 h 42 min
11 kW11 kW3 h 10 min
22 kW11 kW3 h 10 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 15–80% in 30 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

A290 GT Premium 52 2025Italy · 2025 · configuration and data from the indicated source · Documented data with indicative values
Indicative usable capacity
≈ 52 kWh
Maximum AC power
11 kW
Maximum DC power
100 kW
Nominal/gross capacity
Unverified
Declared WLTP range
380 km
Declared WLTP consumption
15.8 kWh/100 km
Motor and drivetrain
130 kW · Front
Documented configuration
2025
Market status
Model marketed in Italy

Model in the Italian range. Configuration year and equipment are identified; WLTP data and times vary with equipment and conditions.

Declared AC WLTP consumption includes charging energy: do not add losses again. It is a homologation value, not a prediction of road consumption.

EV Database reports a 52 kWh usable reference; the Alpine brochure states 52 kWh without distinguishing gross and net. Capacity is documented but not confirmed as net by the manufacturer. 2025 brochure range; MY26 configurator WLTP figures are not applied to these configurations.

AC charging time from 20–80%

Energy stored in this window is approximately 31.2 kWh. With 10% losses, estimated supply energy is 34.7 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW15 h 05 min
3.7 kW3.7 kW9 h 23 min
7.4 kW7.4 kW4 h 42 min
11 kW11 kW3 h 10 min
22 kW11 kW3 h 10 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 15–80% in 30 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

A290 GTS 52 2025Italy · 2025 · configuration and data from the indicated source · Documented data with indicative values
Indicative usable capacity
≈ 52 kWh
Maximum AC power
11 kW
Maximum DC power
100 kW
Nominal/gross capacity
Unverified
Declared WLTP range
364 km
Declared WLTP consumption
16.5 kWh/100 km
Motor and drivetrain
160 kW · Front
Documented configuration
2025
Market status
Model marketed in Italy

Model in the Italian range. Configuration year and equipment are identified; WLTP data and times vary with equipment and conditions.

Declared AC WLTP consumption includes charging energy: do not add losses again. It is a homologation value, not a prediction of road consumption.

EV Database reports a 52 kWh usable reference; the Alpine brochure states 52 kWh without distinguishing gross and net. Capacity is documented but not confirmed as net by the manufacturer. 2025 brochure range; MY26 configurator WLTP figures are not applied to these configurations.

AC charging time from 20–80%

Energy stored in this window is approximately 31.2 kWh. With 10% losses, estimated supply energy is 34.7 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW15 h 05 min
3.7 kW3.7 kW9 h 23 min
7.4 kW7.4 kW4 h 42 min
11 kW11 kW3 h 10 min
22 kW11 kW3 h 10 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 15–80% in 30 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

How to use these results

A 22 kW AC station cannot exceed the onboard charger limit. For Alpine A290, the individual version figures in the table are more useful than the commercial name alone. Also check available power and installation phases.

Estimated cost multiplies supply kWh by your tariff. DC charging follows a curve and cannot be calculated by dividing energy by peak power. Sources and reference windows are listed for each version.

Other models to explore