Citroen E-Mehari
Choose your version and where to charge. Then calculate charging time and cost with your car already selected.
Set up your charging session
How much does charging cost?
Compare batteries using your tariffs. Initial values of 0.30 and 0.65 €/kWh are examples, not offers or market averages.
Supply energy = usable capacity × charge change ÷ (1 − losses). Costs cover energy only, excluding subscriptions and other charges. Actual losses vary with power, installation and temperature.
Example from 20–80%, with assumed losses of 10%.
| Version | Estimated supply energy | Home | Public |
|---|---|---|---|
| E-Mehari LMP 30 2018 · 2018 · France / Europe · AC3.7 | 20 kWh | 6.00 € | 13.00 € |
Technical data and sources Versions, AC tables and DC references
Versions and technical data
Check your version's year and equipment. Specifications, indicative tables and sources are listed here.
Some capacities are indicative. Version notes distinguish documented values from estimates.
E-Mehari LMP 30 2018 · 2018 · France / Europe · AC3.7LMP 30 2018 · 2018 · Documented data with indicative values
- Indicative usable capacity
- ≈ 30 kWh
- Maximum AC power
- 3.7 kW
- Maximum DC power
- Unavailable
- Nominal/gross capacity
- Unverified
- Declared WLTP range
- Not verified in the catalogue
- Declared WLTP consumption
- Not verified in the catalogue
- Connectors
- AC: Type 1 · DC: Non disponibile
- Documented configuration
- 2018
- Configuration market
- France / Europe
- Market status
- Historical version
Source market: France / Europe. Historical configuration; current ordering availability is not certified.
Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.
Indicative usable capacity: value from the independent technical source, not manufacturer confirmation of net capacity. Declared capacity 30 kWh, AC 3.7 kW and no DC. LMP battery: parked thermal-maintenance energy is excluded from the fixed-loss calculator. Separate from Bluesummer.
AC charging time from 20–80%
Energy stored in this window is approximately 18 kWh. With 10% losses, estimated supply energy is 20 kWh.
| Available power | Applied limit | Estimated time |
|---|---|---|
| 2.3 kW | 2.3 kW | 8 h 42 min |
| 3.7 kW | 3.7 kW | 5 h 25 min |
| 7.4 kW | 3.7 kW | 5 h 25 min |
| 11 kW | 3.7 kW | 5 h 25 min |
| 22 kW | 3.7 kW | 5 h 25 min |
Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.
Rapid DC charging
The catalogue does not list rapid DC charging for this version. It charges on AC up to 3.7 kW under conditions compatible with its onboard charger.
Sources and version
- Primary source (original title): Mister EV · specialista di ricarica · specifica tecnica indipendente europea ↗
- Additional source (original title): Documentazione integrativa della configurazione ↗
- Verification date in the catalogue: . Check your car's year, market and equipment in the source.
How to use these results
A 22 kW AC station cannot exceed the onboard charger limit. For Citroen E-Mehari, the individual version figures in the table are more useful than the commercial name alone. Also check available power and installation phases.
Estimated cost multiplies supply kWh by your tariff. DC charging follows a curve and cannot be calculated by dividing energy by peak power. Sources and reference windows are listed for each version.