RicaoraRicaora
CHARGING TIME AND COST

GWM ORA 03

Choose your version and where to charge. Then calculate charging time and cost with your car already selected.

5 versions45.4–59.3 kWh in the catalogueSources for every version

Set up your charging session

Choose a version to see its charging limits and continue.

In the calculator you can change percentages, power, tariff and conditions. For a household socket, ask a qualified professional to check that the installation is suitable for EV charging.

How much does charging cost?

Compare batteries using your tariffs. Initial values of 0.30 and 0.65 €/kWh are examples, not offers or market averages.

Supply energy = usable capacity × charge change ÷ (1 − losses). Costs cover energy only, excluding subscriptions and other charges. Actual losses vary with power, installation and temperature.

Example from 20–80%, with assumed losses of 10%.

Session energy and cost for each battery
VersionEstimated supply energyHomePublic
ORA 03 300 45.4 net AC11 Germany specification 202630.27 kWh9.08 €19.67 €
ORA 03 300 Pro 45.4 net AC11 Germany specification 202630.27 kWh9.08 €19.67 €
ORA 03 400 Pro 59.3 net AC11 Germany specification 202639.53 kWh11.86 €25.70 €
ORA 03 400 Pro+ 59.3 net AC11 Germany specification 202639.53 kWh11.86 €25.70 €
ORA 03 GT 59.3 net AC11 Germany specification 202639.53 kWh11.86 €25.70 €
Technical data and sources Versions, AC tables and DC references

Versions and technical data

Check your version's year and equipment. Specifications, indicative tables and sources are listed here.

ORA 03 300 45.4 net AC11 Germany specification 2026ORA 03 300 45.4 net AC11 Germany specification 2026 · 2026 · Manufacturer-documented specifications
Usable battery capacity
45.4 kWh
Maximum AC power
11 kW
Maximum DC power
64 kW
Nominal/gross capacity
47.8 kWh
Declared WLTP range
Not verified in the catalogue
Declared WLTP consumption
Not verified in the catalogue
Motor and drivetrain
126 kW ·
Documented configuration
2026
Configuration market
Germany
Market status
Check availability in your country

Source market: Germany. Documented European specification; catalogue inclusion does not certify current ordering availability in Italy or every European country.

Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.

German table consulted 16 October 2026. Net and gross capacity are explicit; DC 64/67 kW differ by battery. Separate from the new Australian 57.7 kWh model; consultation does not certify model year.

AC charging time from 20–80%

Energy stored in this window is approximately 27.2 kWh. With 10% losses, estimated supply energy is 30.3 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW13 h 10 min
3.7 kW3.7 kW8 h 11 min
7.4 kW7.4 kW4 h 06 min
11 kW11 kW2 h 46 min
22 kW11 kW2 h 46 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 15–80% in 43 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

ORA 03 300 Pro 45.4 net AC11 Germany specification 2026ORA 03 300 Pro 45.4 net AC11 Germany specification 2026 · 2026 · Manufacturer-documented specifications
Usable battery capacity
45.4 kWh
Maximum AC power
11 kW
Maximum DC power
64 kW
Nominal/gross capacity
47.8 kWh
Declared WLTP range
Not verified in the catalogue
Declared WLTP consumption
Not verified in the catalogue
Motor and drivetrain
126 kW ·
Documented configuration
2026
Configuration market
Germany
Market status
Check availability in your country

Source market: Germany. Documented European specification; catalogue inclusion does not certify current ordering availability in Italy or every European country.

Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.

German table consulted 16 October 2026. Net and gross capacity are explicit; DC 64/67 kW differ by battery. Separate from the new Australian 57.7 kWh model; consultation does not certify model year.

AC charging time from 20–80%

Energy stored in this window is approximately 27.2 kWh. With 10% losses, estimated supply energy is 30.3 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW13 h 10 min
3.7 kW3.7 kW8 h 11 min
7.4 kW7.4 kW4 h 06 min
11 kW11 kW2 h 46 min
22 kW11 kW2 h 46 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 15–80% in 43 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

ORA 03 400 Pro 59.3 net AC11 Germany specification 2026ORA 03 400 Pro 59.3 net AC11 Germany specification 2026 · 2026 · Manufacturer-documented specifications
Usable battery capacity
59.3 kWh
Maximum AC power
11 kW
Maximum DC power
67 kW
Nominal/gross capacity
63.1 kWh
Declared WLTP range
Not verified in the catalogue
Declared WLTP consumption
Not verified in the catalogue
Motor and drivetrain
126 kW ·
Documented configuration
2026
Configuration market
Germany
Market status
Check availability in your country

Source market: Germany. Documented European specification; catalogue inclusion does not certify current ordering availability in Italy or every European country.

Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.

German table consulted 16 October 2026. Net and gross capacity are explicit; DC 64/67 kW differ by battery. Separate from the new Australian 57.7 kWh model; consultation does not certify model year.

AC charging time from 20–80%

Energy stored in this window is approximately 35.6 kWh. With 10% losses, estimated supply energy is 39.5 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW17 h 12 min
3.7 kW3.7 kW10 h 42 min
7.4 kW7.4 kW5 h 21 min
11 kW11 kW3 h 36 min
22 kW11 kW3 h 36 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 15–80% in 48 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

ORA 03 400 Pro+ 59.3 net AC11 Germany specification 2026ORA 03 400 Pro+ 59.3 net AC11 Germany specification 2026 · 2026 · Manufacturer-documented specifications
Usable battery capacity
59.3 kWh
Maximum AC power
11 kW
Maximum DC power
67 kW
Nominal/gross capacity
63.1 kWh
Declared WLTP range
Not verified in the catalogue
Declared WLTP consumption
Not verified in the catalogue
Motor and drivetrain
126 kW ·
Documented configuration
2026
Configuration market
Germany
Market status
Check availability in your country

Source market: Germany. Documented European specification; catalogue inclusion does not certify current ordering availability in Italy or every European country.

Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.

German table consulted 16 October 2026. Net and gross capacity are explicit; DC 64/67 kW differ by battery. Separate from the new Australian 57.7 kWh model; consultation does not certify model year.

AC charging time from 20–80%

Energy stored in this window is approximately 35.6 kWh. With 10% losses, estimated supply energy is 39.5 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW17 h 12 min
3.7 kW3.7 kW10 h 42 min
7.4 kW7.4 kW5 h 21 min
11 kW11 kW3 h 36 min
22 kW11 kW3 h 36 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 15–80% in 48 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

ORA 03 GT 59.3 net AC11 Germany specification 2026ORA 03 GT 59.3 net AC11 Germany specification 2026 · 2026 · Manufacturer-documented specifications
Usable battery capacity
59.3 kWh
Maximum AC power
11 kW
Maximum DC power
67 kW
Nominal/gross capacity
63.1 kWh
Declared WLTP range
Not verified in the catalogue
Declared WLTP consumption
Not verified in the catalogue
Motor and drivetrain
126 kW ·
Documented configuration
2026
Configuration market
Germany
Market status
Check availability in your country

Source market: Germany. Documented European specification; catalogue inclusion does not certify current ordering availability in Italy or every European country.

Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.

German table consulted 16 October 2026. Net and gross capacity are explicit; DC 64/67 kW differ by battery. Separate from the new Australian 57.7 kWh model; consultation does not certify model year.

AC charging time from 20–80%

Energy stored in this window is approximately 35.6 kWh. With 10% losses, estimated supply energy is 39.5 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW17 h 12 min
3.7 kW3.7 kW10 h 42 min
7.4 kW7.4 kW5 h 21 min
11 kW11 kW3 h 36 min
22 kW11 kW3 h 36 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 15–80% in 48 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

How to use these results

A 22 kW AC station cannot exceed the onboard charger limit. For GWM ORA 03, the individual version figures in the table are more useful than the commercial name alone. Also check available power and installation phases.

Estimated cost multiplies supply kWh by your tariff. DC charging follows a curve and cannot be calculated by dividing energy by peak power. Sources and reference windows are listed for each version.

Other models to explore