RicaoraRicaora
CHARGING TIME AND COST

Jaecoo 5 EV

Choose your version and where to charge. Then calculate charging time and cost with your car already selected.

2 versions≈ 60.9 kWh in the catalogueSources for every version

Set up your charging session

Choose a version to see its charging limits and continue.

In the calculator you can change percentages, power, tariff and conditions. For a household socket, ask a qualified professional to check that the installation is suitable for EV charging.

How much does charging cost?

Compare batteries using your tariffs. Initial values of 0.30 and 0.65 €/kWh are examples, not offers or market averages.

Supply energy = usable capacity × charge change ÷ (1 − losses). Costs cover energy only, excluding subscriptions and other charges. Actual losses vary with power, installation and temperature.

Example from 20–80%, with assumed losses of 10%.

Session energy and cost for each battery
VersionEstimated supply energyHomePublic
5 EV Exclusive 60.9 AC10 Italy March 202640.6 kWh12.18 €26.39 €
5 EV Pure 60.9 AC10 Italy March 202640.6 kWh12.18 €26.39 €
Technical data and sources Versions, AC tables and DC references

Versions and technical data

Check your version's year and equipment. Specifications, indicative tables and sources are listed here.

Some capacities are indicative. Version notes distinguish documented values from estimates.

5 EV Exclusive 60.9 AC10 Italy March 20265 EV Exclusive 60.9 AC10 Italy March 2026 · 2026 · Documented data with indicative values
Indicative usable capacity
≈ 60.9 kWh
Maximum AC power
10 kW
Maximum DC power
80 kW
Nominal/gross capacity
Unverified
Declared WLTP range
Not verified in the catalogue
Declared WLTP consumption
Not verified in the catalogue
Motor and drivetrain
155 kW ·
Documented configuration
2026
Market status
Model marketed in Italy

Source configuration and market are identified; check your vehicle year and equipment.

Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.

The source declares 60.9 kWh without specifying net capacity. We explicitly use the declared figure as an approximation: it may overestimate usable energy, time and cost. It is not certified net capacity and no separate gross capacity is inferred. Italian price list effective 1 March 2026: 60.9 kWh, DC 80/AC 10 kW. Does not inherit Omoda 5 EV or other-market charging powers; 60.9 comes from the technical table, rounded to 61 in the presentation.

AC charging time from 20–80%

Energy stored in this window is approximately 36.5 kWh. With 10% losses, estimated supply energy is 40.6 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW17 h 40 min
3.7 kW3.7 kW10 h 59 min
7.4 kW7.4 kW5 h 30 min
11 kW10 kW4 h 04 min
22 kW10 kW4 h 04 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 30–80% in 28 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

5 EV Pure 60.9 AC10 Italy March 20265 EV Pure 60.9 AC10 Italy March 2026 · 2026 · Documented data with indicative values
Indicative usable capacity
≈ 60.9 kWh
Maximum AC power
10 kW
Maximum DC power
80 kW
Nominal/gross capacity
Unverified
Declared WLTP range
Not verified in the catalogue
Declared WLTP consumption
Not verified in the catalogue
Motor and drivetrain
155 kW ·
Documented configuration
2026
Market status
Model marketed in Italy

Source configuration and market are identified; check your vehicle year and equipment.

Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.

The source declares 60.9 kWh without specifying net capacity. We explicitly use the declared figure as an approximation: it may overestimate usable energy, time and cost. It is not certified net capacity and no separate gross capacity is inferred. Italian price list effective 1 March 2026: 60.9 kWh, DC 80/AC 10 kW. Does not inherit Omoda 5 EV or other-market charging powers; 60.9 comes from the technical table, rounded to 61 in the presentation.

AC charging time from 20–80%

Energy stored in this window is approximately 36.5 kWh. With 10% losses, estimated supply energy is 40.6 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW17 h 40 min
3.7 kW3.7 kW10 h 59 min
7.4 kW7.4 kW5 h 30 min
11 kW10 kW4 h 04 min
22 kW10 kW4 h 04 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 30–80% in 28 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

How to use these results

A 22 kW AC station cannot exceed the onboard charger limit. For Jaecoo 5 EV, the individual version figures in the table are more useful than the commercial name alone. Also check available power and installation phases.

Estimated cost multiplies supply kWh by your tariff. DC charging follows a curve and cannot be calculated by dividing energy by peak power. Sources and reference windows are listed for each version.

Other models to explore