RicaoraRicaora
CHARGING TIME AND COST

KGM Korando e-Motion

Choose your version and where to charge. Then calculate charging time and cost with your car already selected.

1 version≈ 61.5 kWh in the catalogueSources for every version

Set up your charging session

Your version is selected. Choose where to charge.

In the calculator you can change percentages, power, tariff and conditions. For a household socket, ask a qualified professional to check that the installation is suitable for EV charging.

How much does charging cost?

Compare batteries using your tariffs. Initial values of 0.30 and 0.65 €/kWh are examples, not offers or market averages.

Supply energy = usable capacity × charge change ÷ (1 − losses). Costs cover energy only, excluding subscriptions and other charges. Actual losses vary with power, installation and temperature.

Example from 20–80%, with assumed losses of 10%.

Session energy and cost for each battery
VersionEstimated supply energyHomePublic
Korando e-Motion SsangYong UK 61.5 · 2022 · United Kingdom · AC6.641 kWh12.30 €26.65 €
Technical data and sources Versions, AC tables and DC references

Versions and technical data

Check your version's year and equipment. Specifications, indicative tables and sources are listed here.

Some capacities are indicative. Version notes distinguish documented values from estimates.

Korando e-Motion SsangYong UK 61.5 · 2022 · United Kingdom · AC6.6SsangYong UK 61.5 · 2022 · Documented data with indicative values
Indicative usable capacity
≈ 61.5 kWh
Maximum AC power
6.6 kW
Maximum DC power
50 kW
Nominal/gross capacity
Unverified
Declared WLTP range
Not verified in the catalogue
Declared WLTP consumption
Not verified in the catalogue
Connectors
AC: Type 2 · DC: CCS
Documented configuration
2022
Configuration market
United Kingdom
Market status
Historical version

Source market: United Kingdom. Historical configuration; current ordering availability is not certified.

Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.

Indicative usable capacity: the source states capacity without certifying it as net here; energy, time and cost may be overestimated. SsangYong UK brochure: AC 6.6 and CCS 50 kW. The 74 kW peak from other tables is not transferred; KGM/SsangYong is treated as one family.

AC charging time from 20–80%

Energy stored in this window is approximately 36.9 kWh. With 10% losses, estimated supply energy is 41 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW17 h 50 min
3.7 kW3.7 kW11 h 05 min
7.4 kW6.6 kW6 h 13 min
11 kW6.6 kW6 h 13 min
22 kW6.6 kW6 h 13 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

No DC time reference with a battery window is reported for this version. Peak kW cannot establish actual time: power varies with battery, temperature and station. The full calculator uses an estimated curve and explains its limits.

Sources and version

How to use these results

A 22 kW AC station cannot exceed the onboard charger limit. For KGM Korando e-Motion, the individual version figures in the table are more useful than the commercial name alone. Also check available power and installation phases.

Estimated cost multiplies supply kWh by your tariff. DC charging follows a curve and cannot be calculated by dividing energy by peak power. Sources and reference windows are listed for each version.

Other models to explore