RicaoraRicaora
CHARGING TIME AND COST

Changan Deepal S05

Choose your version and where to charge. Then calculate charging time and cost with your car already selected.

3 versions≈ 68.8 kWh in the catalogueSources for every version

Set up your charging session

Choose a version to see its charging limits and continue.

In the calculator you can change percentages, power, tariff and conditions. For a household socket, ask a qualified professional to check that the installation is suitable for EV charging.

How much does charging cost?

Compare batteries using your tariffs. Initial values of 0.30 and 0.65 €/kWh are examples, not offers or market averages.

Supply energy = usable capacity × charge change ÷ (1 − losses). Costs cover energy only, excluding subscriptions and other charges. Actual losses vary with power, installation and temperature.

Example from 20–80%, with assumed losses of 10%.

Session energy and cost for each battery
VersionEstimated supply energyHomePublic
Deepal S05 AWD Max 68.8 AC11 Italy 202645.87 kWh13.76 €29.81 €
Deepal S05 RWD Max 68.8 AC11 Italy 202645.87 kWh13.76 €29.81 €
Deepal S05 RWD Pro 68.8 AC11 Italy 202645.87 kWh13.76 €29.81 €
Technical data and sources Versions, AC tables and DC references

Versions and technical data

Check your version's year and equipment. Specifications, indicative tables and sources are listed here.

Some capacities are indicative. Version notes distinguish documented values from estimates.

Deepal S05 AWD Max 68.8 AC11 Italy 2026Deepal S05 AWD Max 68.8 AC11 Italy 2026 · 2026 · Documented data with indicative values
Indicative usable capacity
≈ 68.8 kWh
Maximum AC power
11 kW
Maximum DC power
200 kW
Nominal/gross capacity
Unverified
Declared WLTP range
445 km
Declared WLTP consumption
17.5 kWh/100 km
Motor and drivetrain
320 kW · All-wheel drive
Documented configuration
2026
Market status
Model marketed in Italy

Source configuration and market are identified; check your vehicle year and equipment.

Declared AC WLTP consumption includes charging energy: do not add losses again. It is a homologation value, not a prediction of road consumption.

The source declares 68.8 kWh without specifying net capacity. We explicitly use the declared figure as an approximation: it may overestimate usable energy, time and cost. It is not certified net capacity and no separate gross capacity is inferred. Italian specification explicitly states 200 kW as vehicle DC power. Range-extender version is excluded.

AC charging time from 20–80%

Energy stored in this window is approximately 41.3 kWh. With 10% losses, estimated supply energy is 45.9 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW19 h 57 min
3.7 kW3.7 kW12 h 24 min
7.4 kW7.4 kW6 h 12 min
11 kW11 kW4 h 11 min
22 kW11 kW4 h 11 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 30–80% in 15 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

Deepal S05 RWD Max 68.8 AC11 Italy 2026Deepal S05 RWD Max 68.8 AC11 Italy 2026 · 2026 · Documented data with indicative values
Indicative usable capacity
≈ 68.8 kWh
Maximum AC power
11 kW
Maximum DC power
200 kW
Nominal/gross capacity
Unverified
Declared WLTP range
485 km
Declared WLTP consumption
15.9 kWh/100 km
Motor and drivetrain
200 kW · Rear
Documented configuration
2026
Market status
Model marketed in Italy

Source configuration and market are identified; check your vehicle year and equipment.

Declared AC WLTP consumption includes charging energy: do not add losses again. It is a homologation value, not a prediction of road consumption.

The source declares 68.8 kWh without specifying net capacity. We explicitly use the declared figure as an approximation: it may overestimate usable energy, time and cost. It is not certified net capacity and no separate gross capacity is inferred. Italian specification explicitly states 200 kW as vehicle DC power. Range-extender version is excluded.

AC charging time from 20–80%

Energy stored in this window is approximately 41.3 kWh. With 10% losses, estimated supply energy is 45.9 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW19 h 57 min
3.7 kW3.7 kW12 h 24 min
7.4 kW7.4 kW6 h 12 min
11 kW11 kW4 h 11 min
22 kW11 kW4 h 11 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 30–80% in 15 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

Deepal S05 RWD Pro 68.8 AC11 Italy 2026Deepal S05 RWD Pro 68.8 AC11 Italy 2026 · 2026 · Documented data with indicative values
Indicative usable capacity
≈ 68.8 kWh
Maximum AC power
11 kW
Maximum DC power
200 kW
Nominal/gross capacity
Unverified
Declared WLTP range
485 km
Declared WLTP consumption
15.9 kWh/100 km
Motor and drivetrain
200 kW · Rear
Documented configuration
2026
Market status
Model marketed in Italy

Source configuration and market are identified; check your vehicle year and equipment.

Declared AC WLTP consumption includes charging energy: do not add losses again. It is a homologation value, not a prediction of road consumption.

The source declares 68.8 kWh without specifying net capacity. We explicitly use the declared figure as an approximation: it may overestimate usable energy, time and cost. It is not certified net capacity and no separate gross capacity is inferred. Italian specification explicitly states 200 kW as vehicle DC power. Range-extender version is excluded.

AC charging time from 20–80%

Energy stored in this window is approximately 41.3 kWh. With 10% losses, estimated supply energy is 45.9 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW19 h 57 min
3.7 kW3.7 kW12 h 24 min
7.4 kW7.4 kW6 h 12 min
11 kW11 kW4 h 11 min
22 kW11 kW4 h 11 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 30–80% in 15 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

How to use these results

A 22 kW AC station cannot exceed the onboard charger limit. For Changan Deepal S05, the individual version figures in the table are more useful than the commercial name alone. Also check available power and installation phases.

Estimated cost multiplies supply kWh by your tariff. DC charging follows a curve and cannot be calculated by dividing energy by peak power. Sources and reference windows are listed for each version.

Other models to explore