Changan Deepal S07
Choose your version and where to charge. Then calculate charging time and cost with your car already selected.
Set up your charging session
How much does charging cost?
Compare batteries using your tariffs. Initial values of 0.30 and 0.65 €/kWh are examples, not offers or market averages.
Supply energy = usable capacity × charge change ÷ (1 − losses). Costs cover energy only, excluding subscriptions and other charges. Actual losses vary with power, installation and temperature.
Example from 20–80%, with assumed losses of 10%.
| Version | Estimated supply energy | Home | Public |
|---|---|---|---|
| Deepal S07 RWD 79.97 AC11 Italy January 2026 | 53.31 kWh | 15.99 € | 34.65 € |
Technical data and sources Versions, AC tables and DC references
Versions and technical data
Check your version's year and equipment. Specifications, indicative tables and sources are listed here.
Some capacities are indicative. Version notes distinguish documented values from estimates.
Deepal S07 RWD 79.97 AC11 Italy January 2026Deepal S07 RWD 79.97 AC11 Italy January 2026 · 2026 · Documented data with indicative values
- Indicative usable capacity
- ≈ 80 kWh
- Maximum AC power
- 11 kW
- Maximum DC power
- 93 kW
- Nominal/gross capacity
- Unverified
- Declared WLTP range
- Not verified in the catalogue
- Declared WLTP consumption
- Not verified in the catalogue
- Motor and drivetrain
- 160 kW ·
- Documented configuration
- 2026
- Configuration market
- Italy
- Market status
- Model marketed in Italy
Source market: Italy. Documented European specification; catalogue inclusion does not certify current ordering availability in Italy or every European country.
Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.
The source declares 79.97 kWh without specifying net capacity. We explicitly use the declared figure as an approximation: it may overestimate usable energy, time and cost. It is not certified net capacity and no separate gross capacity is inferred. Italian price list, January 2026: BEV 160 kW, AC 11/DC 93 kW. Changan's European table confirms 79.97 kWh capacity; the Italian row abbreviated as kW is not interpreted as motor power. Range-extender version excluded.
AC charging time from 20–80%
Energy stored in this window is approximately 48 kWh. With 10% losses, estimated supply energy is 53.3 kWh.
| Available power | Applied limit | Estimated time |
|---|---|---|
| 2.3 kW | 2.3 kW | 23 h 11 min |
| 3.7 kW | 3.7 kW | 14 h 25 min |
| 7.4 kW | 7.4 kW | 7 h 13 min |
| 11 kW | 11 kW | 4 h 51 min |
| 22 kW | 11 kW | 4 h 51 min |
Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.
Rapid DC charging
No DC time reference with a battery window is reported for this version. Peak kW cannot establish actual time: power varies with battery, temperature and station. The full calculator uses an estimated curve and explains its limits.
Sources and version
- Primary source (original title): Costruttore · configurazione documentata ↗
- Additional source (original title): Documentazione tecnica integrativa del costruttore ↗
- Verification date in the catalogue: . Check your car's year, market and equipment in the source.
How to use these results
A 22 kW AC station cannot exceed the onboard charger limit. For Changan Deepal S07, the individual version figures in the table are more useful than the commercial name alone. Also check available power and installation phases.
Estimated cost multiplies supply kWh by your tariff. DC charging follows a curve and cannot be calculated by dividing energy by peak power. Sources and reference windows are listed for each version.