Kia EV2
Choose your version and where to charge. Then calculate charging time and cost with your car already selected.
Set up your charging session
How much does charging cost?
Compare batteries using your tariffs. Initial values of 0.30 and 0.65 €/kWh are examples, not offers or market averages.
Supply energy = usable capacity × charge change ÷ (1 − losses). Costs cover energy only, excluding subscriptions and other charges. Actual losses vary with power, installation and temperature.
Example from 20–80%, with assumed losses of 10%.
| Version | Estimated supply energy | Home | Public |
|---|---|---|---|
| EV2 42.2 AC11 | 28.13 kWh | 8.44 € | 18.29 € |
| EV2 42.2 AC22 | 28.13 kWh | 8.44 € | 18.29 € |
| EV2 61 AC11 | 40.67 kWh | 12.20 € | 26.43 € |
| EV2 61 AC22 | 40.67 kWh | 12.20 € | 26.43 € |
Technical data and sources Versions, AC tables and DC references
Versions and technical data
Check your version's year and equipment. Specifications, indicative tables and sources are listed here.
Some capacities are indicative. Version notes distinguish documented values from estimates.
EV2 42.2 AC11Standard Range · Europe · 2026 · AC11 standard · Documented data with indicative values
- Indicative usable capacity
- ≈ 42.2 kWh
- Maximum AC power
- 11 kW
- Maximum DC power
- 118 kW
- Nominal/gross capacity
- 42.2 kWh
- Declared WLTP range
- Not verified in the catalogue
- Declared WLTP consumption
- Not verified in the catalogue
- Market status
- Check availability in your country
Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.
Indicative usable capacity: the manufacturer publishes battery capacity without specifying net capacity.
AC charging time from 20–80%
Energy stored in this window is approximately 25.3 kWh. With 10% losses, estimated supply energy is 28.1 kWh.
| Available power | Applied limit | Estimated time |
|---|---|---|
| 2.3 kW | 2.3 kW | 12 h 14 min |
| 3.7 kW | 3.7 kW | 7 h 37 min |
| 7.4 kW | 7.4 kW | 3 h 49 min |
| 11 kW | 11 kW | 2 h 34 min |
| 22 kW | 11 kW | 2 h 34 min |
Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.
Rapid DC charging
The catalogue reports a reference of 10–80% in 29 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.
Sources and version
- Primary source (original title): Kia · fonte costruttore ↗
- Verification date in the catalogue: . Check your car's year, market and equipment in the source.
EV2 42.2 AC22Standard Range · Europe · 2026 · AC22 optional · Documented data with indicative values
- Indicative usable capacity
- ≈ 42.2 kWh
- Maximum AC power
- 22 kW
- Maximum DC power
- 118 kW
- Nominal/gross capacity
- 42.2 kWh
- Declared WLTP range
- Not verified in the catalogue
- Declared WLTP consumption
- Not verified in the catalogue
- Market status
- Check availability in your country
Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.
Indicative usable capacity: the manufacturer publishes battery capacity without specifying net capacity.
AC charging time from 20–80%
Energy stored in this window is approximately 25.3 kWh. With 10% losses, estimated supply energy is 28.1 kWh.
| Available power | Applied limit | Estimated time |
|---|---|---|
| 2.3 kW | 2.3 kW | 12 h 14 min |
| 3.7 kW | 3.7 kW | 7 h 37 min |
| 7.4 kW | 7.4 kW | 3 h 49 min |
| 11 kW | 11 kW | 2 h 34 min |
| 22 kW | 22 kW | 1 h 17 min |
Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.
Rapid DC charging
The catalogue reports a reference of 10–80% in 29 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.
Sources and version
- Primary source (original title): Kia · fonte costruttore ↗
- Verification date in the catalogue: . Check your car's year, market and equipment in the source.
EV2 61 AC11Long Range · Europe · 2026 · AC11 standard · Documented data with indicative values
- Indicative usable capacity
- ≈ 61 kWh
- Maximum AC power
- 11 kW
- Maximum DC power
- 118 kW
- Nominal/gross capacity
- 61 kWh
- Declared WLTP range
- Not verified in the catalogue
- Declared WLTP consumption
- Not verified in the catalogue
- Market status
- Check availability in your country
Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.
Indicative usable capacity: the manufacturer publishes battery capacity without specifying net capacity.
AC charging time from 20–80%
Energy stored in this window is approximately 36.6 kWh. With 10% losses, estimated supply energy is 40.7 kWh.
| Available power | Applied limit | Estimated time |
|---|---|---|
| 2.3 kW | 2.3 kW | 17 h 41 min |
| 3.7 kW | 3.7 kW | 11 h 00 min |
| 7.4 kW | 7.4 kW | 5 h 30 min |
| 11 kW | 11 kW | 3 h 42 min |
| 22 kW | 11 kW | 3 h 42 min |
Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.
Rapid DC charging
The catalogue reports a reference of 10–80% in 30 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.
Sources and version
- Primary source (original title): Kia · fonte costruttore ↗
- Verification date in the catalogue: . Check your car's year, market and equipment in the source.
EV2 61 AC22Long Range · Europe · 2026 · AC22 optional · Documented data with indicative values
- Indicative usable capacity
- ≈ 61 kWh
- Maximum AC power
- 22 kW
- Maximum DC power
- 118 kW
- Nominal/gross capacity
- 61 kWh
- Declared WLTP range
- Not verified in the catalogue
- Declared WLTP consumption
- Not verified in the catalogue
- Market status
- Check availability in your country
Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.
Indicative usable capacity: the manufacturer publishes battery capacity without specifying net capacity.
AC charging time from 20–80%
Energy stored in this window is approximately 36.6 kWh. With 10% losses, estimated supply energy is 40.7 kWh.
| Available power | Applied limit | Estimated time |
|---|---|---|
| 2.3 kW | 2.3 kW | 17 h 41 min |
| 3.7 kW | 3.7 kW | 11 h 00 min |
| 7.4 kW | 7.4 kW | 5 h 30 min |
| 11 kW | 11 kW | 3 h 42 min |
| 22 kW | 22 kW | 1 h 51 min |
Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.
Rapid DC charging
The catalogue reports a reference of 10–80% in 30 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.
Sources and version
- Primary source (original title): Kia · fonte costruttore ↗
- Verification date in the catalogue: . Check your car's year, market and equipment in the source.
How to use these results
A 22 kW AC station cannot exceed the onboard charger limit. For Kia EV2, the individual version figures in the table are more useful than the commercial name alone. Also check available power and installation phases.
Estimated cost multiplies supply kWh by your tariff. DC charging follows a curve and cannot be calculated by dividing energy by peak power. Sources and reference windows are listed for each version.