Nio ES8
Choose your version and where to charge. Then calculate charging time and cost with your car already selected.
Set up your charging session
How much does charging cost?
Compare batteries using your tariffs. Initial values of 0.30 and 0.65 €/kWh are examples, not offers or market averages.
Supply energy = usable capacity × charge change ÷ (1 − losses). Costs cover energy only, excluding subscriptions and other charges. Actual losses vary with power, installation and temperature.
Example from 20–80%, with assumed losses of 10%.
| Version | Estimated supply energy | Home | Public |
|---|---|---|---|
| ES8 Long Range · 2023 · Norway · AC7 | 66.67 kWh | 20.00 € | 43.33 € |
| ES8 Standard Range · 2023 · Norway · AC7 | 50 kWh | 15.00 € | 32.50 € |
Technical data and sources Versions, AC tables and DC references
Versions and technical data
Check your version's year and equipment. Specifications, indicative tables and sources are listed here.
Some capacities are indicative. Version notes distinguish documented values from estimates.
ES8 Long Range · 2023 · Norway · AC7Long Range · 2023 · Documented data with indicative values
- Indicative usable capacity
- ≈ 100 kWh
- Maximum AC power
- 7 kW
- Maximum DC power
- 126 kW
- Nominal/gross capacity
- Unverified
- Declared WLTP range
- Not verified in the catalogue
- Declared WLTP consumption
- Not verified in the catalogue
- Connectors
- AC: Type 2 · DC: CCS
- Documented configuration
- 2023
- Configuration market
- Norway
- Market status
- Historical version
Source market: Norway. Historical configuration; current ordering availability is not certified.
Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.
Indicative usable capacity: the source states capacity without certifying it as net here; energy, time and cost may be overestimated. Norwegian price list, March 2023: AC 7, DC 140/126 kW depending on battery. Not AC 11 from the later EL8; BaaS swaps may change the pack received.
AC charging time from 20–80%
Energy stored in this window is approximately 60 kWh. With 10% losses, estimated supply energy is 66.7 kWh.
| Available power | Applied limit | Estimated time |
|---|---|---|
| 2.3 kW | 2.3 kW | 29 h 00 min |
| 3.7 kW | 3.7 kW | 18 h 02 min |
| 7.4 kW | 7 kW | 9 h 32 min |
| 11 kW | 7 kW | 9 h 32 min |
| 22 kW | 7 kW | 9 h 32 min |
Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.
Rapid DC charging
The catalogue reports a reference of 10–80% in 40 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.
Sources and version
- Primary source (original title): Costruttore / distributore · specifica europea documentata ↗
- Verification date in the catalogue: . Check your car's year, market and equipment in the source.
ES8 Standard Range · 2023 · Norway · AC7Standard Range · 2023 · Documented data with indicative values
- Indicative usable capacity
- ≈ 75 kWh
- Maximum AC power
- 7 kW
- Maximum DC power
- 140 kW
- Nominal/gross capacity
- Unverified
- Declared WLTP range
- Not verified in the catalogue
- Declared WLTP consumption
- Not verified in the catalogue
- Connectors
- AC: Type 2 · DC: CCS
- Documented configuration
- 2023
- Configuration market
- Norway
- Market status
- Historical version
Source market: Norway. Historical configuration; current ordering availability is not certified.
Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.
Indicative usable capacity: the source states capacity without certifying it as net here; energy, time and cost may be overestimated. Norwegian price list, March 2023: AC 7, DC 140/126 kW depending on battery. Not AC 11 from the later EL8; BaaS swaps may change the pack received.
AC charging time from 20–80%
Energy stored in this window is approximately 45 kWh. With 10% losses, estimated supply energy is 50 kWh.
| Available power | Applied limit | Estimated time |
|---|---|---|
| 2.3 kW | 2.3 kW | 21 h 45 min |
| 3.7 kW | 3.7 kW | 13 h 31 min |
| 7.4 kW | 7 kW | 7 h 09 min |
| 11 kW | 7 kW | 7 h 09 min |
| 22 kW | 7 kW | 7 h 09 min |
Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.
Rapid DC charging
The catalogue reports a reference of 10–80% in 30 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.
Sources and version
- Primary source (original title): Costruttore / distributore · specifica europea documentata ↗
- Verification date in the catalogue: . Check your car's year, market and equipment in the source.
How to use these results
A 22 kW AC station cannot exceed the onboard charger limit. For Nio ES8, the individual version figures in the table are more useful than the commercial name alone. Also check available power and installation phases.
Estimated cost multiplies supply kWh by your tariff. DC charging follows a curve and cannot be calculated by dividing energy by peak power. Sources and reference windows are listed for each version.