Nio EL7
Choose your version and where to charge. Then calculate charging time and cost with your car already selected.
Set up your charging session
How much does charging cost?
Compare batteries using your tariffs. Initial values of 0.30 and 0.65 €/kWh are examples, not offers or market averages.
Supply energy = usable capacity × charge change ÷ (1 − losses). Costs cover energy only, excluding subscriptions and other charges. Actual losses vary with power, installation and temperature.
Example from 20–80%, with assumed losses of 10%.
| Version | Estimated supply energy | Home | Public |
|---|---|---|---|
| EL7 100 AC11 Germany June 2023 | 66.67 kWh | 20.00 € | 43.33 € |
| EL7 75 AC11 Germany June 2023 | 50 kWh | 15.00 € | 32.50 € |
Technical data and sources Versions, AC tables and DC references
Versions and technical data
Check your version's year and equipment. Specifications, indicative tables and sources are listed here.
Some capacities are indicative. Version notes distinguish documented values from estimates.
EL7 100 AC11 Germany June 2023EL7 100 AC11 Germany June 2023 · 2023 · Documented data with indicative values
- Indicative usable capacity
- ≈ 100 kWh
- Maximum AC power
- 11 kW
- Maximum DC power
- 125 kW
- Nominal/gross capacity
- Unverified
- Declared WLTP range
- Not verified in the catalogue
- Declared WLTP consumption
- Not verified in the catalogue
- Motor and drivetrain
- 480 kW ·
- Documented configuration
- 2023
- Configuration market
- Germany
- Market status
- Historical version
Source market: Germany. Documented European specification; catalogue inclusion does not certify current ordering availability in Italy or every European country.
Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.
The source declares 100 kWh without specifying net capacity. We explicitly use the declared figure as an approximation: it may overestimate usable energy, time and cost. It is not certified net capacity and no separate gross capacity is inferred. June 2023 price list: declared 75/100 kWh, DC 140/125 kW respectively. EL8 or later-battery peaks are not transferred to this historical list.
AC charging time from 20–80%
Energy stored in this window is approximately 60 kWh. With 10% losses, estimated supply energy is 66.7 kWh.
| Available power | Applied limit | Estimated time |
|---|---|---|
| 2.3 kW | 2.3 kW | 29 h 00 min |
| 3.7 kW | 3.7 kW | 18 h 02 min |
| 7.4 kW | 7.4 kW | 9 h 01 min |
| 11 kW | 11 kW | 6 h 04 min |
| 22 kW | 11 kW | 6 h 04 min |
Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.
Rapid DC charging
The catalogue reports a reference of 10–80% in 40 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.
Sources and version
- Primary source (original title): Costruttore · configurazione documentata ↗
- Verification date in the catalogue: . Check your car's year, market and equipment in the source.
EL7 75 AC11 Germany June 2023EL7 75 AC11 Germany June 2023 · 2023 · Documented data with indicative values
- Indicative usable capacity
- ≈ 75 kWh
- Maximum AC power
- 11 kW
- Maximum DC power
- 140 kW
- Nominal/gross capacity
- Unverified
- Declared WLTP range
- Not verified in the catalogue
- Declared WLTP consumption
- Not verified in the catalogue
- Motor and drivetrain
- 480 kW ·
- Documented configuration
- 2023
- Configuration market
- Germany
- Market status
- Historical version
Source market: Germany. Documented European specification; catalogue inclusion does not certify current ordering availability in Italy or every European country.
Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.
The source declares 75 kWh without specifying net capacity. We explicitly use the declared figure as an approximation: it may overestimate usable energy, time and cost. It is not certified net capacity and no separate gross capacity is inferred. June 2023 price list: declared 75/100 kWh, DC 140/125 kW respectively. EL8 or later-battery peaks are not transferred to this historical list.
AC charging time from 20–80%
Energy stored in this window is approximately 45 kWh. With 10% losses, estimated supply energy is 50 kWh.
| Available power | Applied limit | Estimated time |
|---|---|---|
| 2.3 kW | 2.3 kW | 21 h 45 min |
| 3.7 kW | 3.7 kW | 13 h 31 min |
| 7.4 kW | 7.4 kW | 6 h 46 min |
| 11 kW | 11 kW | 4 h 33 min |
| 22 kW | 11 kW | 4 h 33 min |
Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.
Rapid DC charging
The catalogue reports a reference of 10–80% in 30 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.
Sources and version
- Primary source (original title): Costruttore · configurazione documentata ↗
- Verification date in the catalogue: . Check your car's year, market and equipment in the source.
How to use these results
A 22 kW AC station cannot exceed the onboard charger limit. For Nio EL7, the individual version figures in the table are more useful than the commercial name alone. Also check available power and installation phases.
Estimated cost multiplies supply kWh by your tariff. DC charging follows a curve and cannot be calculated by dividing energy by peak power. Sources and reference windows are listed for each version.