Opel Grandland Electric
Choose your version and where to charge. Then calculate charging time and cost with your car already selected.
Set up your charging session
How much does charging cost?
Compare batteries using your tariffs. Initial values of 0.30 and 0.65 €/kWh are examples, not offers or market averages.
Supply energy = usable capacity × charge change ÷ (1 − losses). Costs cover energy only, excluding subscriptions and other charges. Actual losses vary with power, installation and temperature.
Example from 20–80%, with assumed losses of 10%.
| Version | Estimated supply energy | Home | Public |
|---|---|---|---|
| Grandland Electric 213 CV FWD 73 AC11 MY26 | 48.67 kWh | 14.60 € | 31.63 € |
| Grandland Electric 231 CV Long Range FWD 97 AC11 MY26 | 64.67 kWh | 19.40 € | 42.03 € |
| Grandland Electric 325 CV AWD 73 AC11 MY26 | 48.67 kWh | 14.60 € | 31.63 € |
Technical data and sources Versions, AC tables and DC references
Versions and technical data
Check your version's year and equipment. Specifications, indicative tables and sources are listed here.
Some capacities are indicative. Version notes distinguish documented values from estimates.
Grandland Electric 213 CV FWD 73 AC11 MY26Grandland Electric 213 CV FWD 73 AC11 MY26 · 2026 · Documented data with indicative values
- Indicative usable capacity
- ≈ 73 kWh
- Maximum AC power
- 11 kW
- Maximum DC power
- 150 kW
- Nominal/gross capacity
- Unverified
- Declared WLTP range
- Not verified in the catalogue
- Declared WLTP consumption
- Not verified in the catalogue
- Motor and drivetrain
- 157 kW ·
- Documented configuration
- 2026
- Market status
- Model marketed in Italy
Source configuration and market are identified; check your vehicle year and equipment.
Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.
The source declares 73 kWh without specifying net capacity. We explicitly use the declared figure as an approximation: it may overestimate usable energy, time and cost. It is not certified net capacity and no separate gross capacity is inferred. Italian MY26 specification: 213 CV has DC 150 kW; Long Range and AWD have DC 160 kW. The launch release's 160 kW peak is not assigned to MY26 213 CV. Confirm against individual vehicle documents.
AC charging time from 20–80%
Energy stored in this window is approximately 43.8 kWh. With 10% losses, estimated supply energy is 48.7 kWh.
| Available power | Applied limit | Estimated time |
|---|---|---|
| 2.3 kW | 2.3 kW | 21 h 10 min |
| 3.7 kW | 3.7 kW | 13 h 10 min |
| 7.4 kW | 7.4 kW | 6 h 35 min |
| 11 kW | 11 kW | 4 h 26 min |
| 22 kW | 11 kW | 4 h 26 min |
Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.
Rapid DC charging
The catalogue reports a reference of 20–80% in 29 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.
Sources and version
- Primary source (original title): Costruttore · configurazione documentata ↗
- Verification date in the catalogue: . Check your car's year, market and equipment in the source.
Grandland Electric 231 CV Long Range FWD 97 AC11 MY26Grandland Electric 231 CV Long Range FWD 97 AC11 MY26 · 2026 · Documented data with indicative values
- Indicative usable capacity
- ≈ 97 kWh
- Maximum AC power
- 11 kW
- Maximum DC power
- 160 kW
- Nominal/gross capacity
- Unverified
- Declared WLTP range
- Not verified in the catalogue
- Declared WLTP consumption
- Not verified in the catalogue
- Motor and drivetrain
- 170 kW ·
- Documented configuration
- 2026
- Market status
- Model marketed in Italy
Source configuration and market are identified; check your vehicle year and equipment.
Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.
The source declares 97 kWh without specifying net capacity. We explicitly use the declared figure as an approximation: it may overestimate usable energy, time and cost. It is not certified net capacity and no separate gross capacity is inferred. Italian MY26 specification: 213 CV has DC 150 kW; Long Range and AWD have DC 160 kW. The launch release's 160 kW peak is not assigned to MY26 213 CV. Confirm against individual vehicle documents.
AC charging time from 20–80%
Energy stored in this window is approximately 58.2 kWh. With 10% losses, estimated supply energy is 64.7 kWh.
| Available power | Applied limit | Estimated time |
|---|---|---|
| 2.3 kW | 2.3 kW | 28 h 07 min |
| 3.7 kW | 3.7 kW | 17 h 29 min |
| 7.4 kW | 7.4 kW | 8 h 45 min |
| 11 kW | 11 kW | 5 h 53 min |
| 22 kW | 11 kW | 5 h 53 min |
Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.
Rapid DC charging
No DC time reference with a battery window is reported for this version. Peak kW cannot establish actual time: power varies with battery, temperature and station. The full calculator uses an estimated curve and explains its limits.
Sources and version
- Primary source (original title): Costruttore · configurazione documentata ↗
- Verification date in the catalogue: . Check your car's year, market and equipment in the source.
Grandland Electric 325 CV AWD 73 AC11 MY26Grandland Electric 325 CV AWD 73 AC11 MY26 · 2026 · Documented data with indicative values
- Indicative usable capacity
- ≈ 73 kWh
- Maximum AC power
- 11 kW
- Maximum DC power
- 160 kW
- Nominal/gross capacity
- Unverified
- Declared WLTP range
- Not verified in the catalogue
- Declared WLTP consumption
- Not verified in the catalogue
- Motor and drivetrain
- 239 kW ·
- Documented configuration
- 2026
- Market status
- Model marketed in Italy
Source configuration and market are identified; check your vehicle year and equipment.
Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.
The source declares 73 kWh without specifying net capacity. We explicitly use the declared figure as an approximation: it may overestimate usable energy, time and cost. It is not certified net capacity and no separate gross capacity is inferred. Italian MY26 specification: 213 CV has DC 150 kW; Long Range and AWD have DC 160 kW. The launch release's 160 kW peak is not assigned to MY26 213 CV. Confirm against individual vehicle documents.
AC charging time from 20–80%
Energy stored in this window is approximately 43.8 kWh. With 10% losses, estimated supply energy is 48.7 kWh.
| Available power | Applied limit | Estimated time |
|---|---|---|
| 2.3 kW | 2.3 kW | 21 h 10 min |
| 3.7 kW | 3.7 kW | 13 h 10 min |
| 7.4 kW | 7.4 kW | 6 h 35 min |
| 11 kW | 11 kW | 4 h 26 min |
| 22 kW | 11 kW | 4 h 26 min |
Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.
Rapid DC charging
No DC time reference with a battery window is reported for this version. Peak kW cannot establish actual time: power varies with battery, temperature and station. The full calculator uses an estimated curve and explains its limits.
Sources and version
- Primary source (original title): Costruttore · configurazione documentata ↗
- Verification date in the catalogue: . Check your car's year, market and equipment in the source.
How to use these results
A 22 kW AC station cannot exceed the onboard charger limit. For Opel Grandland Electric, the individual version figures in the table are more useful than the commercial name alone. Also check available power and installation phases.
Estimated cost multiplies supply kWh by your tariff. DC charging follows a curve and cannot be calculated by dividing energy by peak power. Sources and reference windows are listed for each version.