Omoda 5 EV
Choose your version and where to charge. Then calculate charging time and cost with your car already selected.
Set up your charging session
How much does charging cost?
Compare batteries using your tariffs. Initial values of 0.30 and 0.65 €/kWh are examples, not offers or market averages.
Supply energy = usable capacity × charge change ÷ (1 − losses). Costs cover energy only, excluding subscriptions and other charges. Actual losses vary with power, installation and temperature.
Example from 20–80%, with assumed losses of 10%.
| Version | Estimated supply energy | Home | Public |
|---|---|---|---|
| 5 EV CATL 60.9 AC10 2026 | 39.27 kWh | 11.78 € | 25.52 € |
Technical data and sources Versions, AC tables and DC references
Versions and technical data
Check your version's year and equipment. Specifications, indicative tables and sources are listed here.
Some capacities are indicative. Version notes distinguish documented values from estimates.
5 EV CATL 60.9 AC10 2026Italy · price list marzo2026 · CATL60,9 · AC10 · Documented data with indicative values
- Indicative usable capacity
- ≈ 58.9 kWh
- Maximum AC power
- 10 kW
- Maximum DC power
- 130 kW
- Nominal/gross capacity
- Unverified
- Declared WLTP range
- 430 km
- Declared WLTP consumption
- 15.9 kWh/100 km
- Connectors
- AC: CCS · DC: to check
- Motor and drivetrain
- 155 kW · Front
- Documented configuration
- 2026
- Market status
- Model marketed in Italy
Configuration from the Italian price list effective 1 March 2026. Check your vehicle version and equipment.
Declared AC WLTP consumption includes charging energy: do not add losses again. It is a homologation value, not a prediction of road consumption.
CATL 60.9 kWh configuration in the Italian price list of 1 March 2026: AC 10, DC 130 kW, 30–80% in 28 minutes. EV Database gives 58.9 kWh usable: indicative, not explicitly confirmed as net by the manufacturer. European-sheet AC 11 kW is not transferred to the Italian price list. Not automatically applicable to earlier batteries marketed as 61.1 kWh. Gross capacity is unconfirmed.
AC charging time from 20–80%
Energy stored in this window is approximately 35.3 kWh. With 10% losses, estimated supply energy is 39.3 kWh.
| Available power | Applied limit | Estimated time |
|---|---|---|
| 2.3 kW | 2.3 kW | 17 h 05 min |
| 3.7 kW | 3.7 kW | 10 h 37 min |
| 7.4 kW | 7.4 kW | 5 h 19 min |
| 11 kW | 10 kW | 3 h 56 min |
| 22 kW | 10 kW | 3 h 56 min |
Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.
Rapid DC charging
The catalogue reports a reference of 30–80% in 28 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.
Sources and version
- Primary source (original title): EV Database · scheda tecnica indipendente europea ↗
- Usable capacity: source and data qualification ↗
- Verification date in the catalogue: . Check your car's year, market and equipment in the source.
How to use these results
A 22 kW AC station cannot exceed the onboard charger limit. For Omoda 5 EV, the individual version figures in the table are more useful than the commercial name alone. Also check available power and installation phases.
Estimated cost multiplies supply kWh by your tariff. DC charging follows a curve and cannot be calculated by dividing energy by peak power. Sources and reference windows are listed for each version.