RicaoraRicaora
CHARGING TIME AND COST

Polestar 5

Choose your version and where to charge. Then calculate charging time and cost with your car already selected.

2 versions≈ 112 kWh in the catalogueSources for every version

Set up your charging session

Choose a version to see its charging limits and continue.

In the calculator you can change percentages, power, tariff and conditions. For a household socket, ask a qualified professional to check that the installation is suitable for EV charging.

How much does charging cost?

Compare batteries using your tariffs. Initial values of 0.30 and 0.65 €/kWh are examples, not offers or market averages.

Supply energy = usable capacity × charge change ÷ (1 − losses). Costs cover energy only, excluding subscriptions and other charges. Actual losses vary with power, installation and temperature.

Example from 20–80%, with assumed losses of 10%.

Session energy and cost for each battery
VersionEstimated supply energyHomePublic
Polestar 5 Dual Motor 112 · 2026 · United Kingdom · AC1174.67 kWh22.40 €48.53 €
Polestar 5 Performance 112 · 2026 · United Kingdom · AC1174.67 kWh22.40 €48.53 €
Technical data and sources Versions, AC tables and DC references

Versions and technical data

Check your version's year and equipment. Specifications, indicative tables and sources are listed here.

Some capacities are indicative. Version notes distinguish documented values from estimates.

Polestar 5 Dual Motor 112 · 2026 · United Kingdom · AC11Dual Motor 112 · 2026 · Documented data with indicative values
Indicative usable capacity
≈ 112 kWh
Maximum AC power
11 kW
Maximum DC power
350 kW
Nominal/gross capacity
Unverified
Declared WLTP range
Not verified in the catalogue
Declared WLTP consumption
Not verified in the catalogue
Connectors
AC: Type 2 · DC: CCS
Documented configuration
2026
Configuration market
United Kingdom
Market status
Check availability in your country

Source market: United Kingdom. Check availability, year and equipment in your country.

Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.

Indicative usable capacity: the source states capacity without certifying it as net here; energy, time and cost may be overestimated. Declared battery capacity 112 kWh, AC 11/DC 350 kW. The Italian text incorrectly abbreviates capacity as kW; the UK page confirms the unit. No net capacity of 106 kWh is inferred.

AC charging time from 20–80%

Energy stored in this window is approximately 67.2 kWh. With 10% losses, estimated supply energy is 74.7 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW32 h 28 min
3.7 kW3.7 kW20 h 11 min
7.4 kW7.4 kW10 h 06 min
11 kW11 kW6 h 48 min
22 kW11 kW6 h 48 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 10–80% in 22 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

Polestar 5 Performance 112 · 2026 · United Kingdom · AC11Performance 112 · 2026 · Documented data with indicative values
Indicative usable capacity
≈ 112 kWh
Maximum AC power
11 kW
Maximum DC power
350 kW
Nominal/gross capacity
Unverified
Declared WLTP range
Not verified in the catalogue
Declared WLTP consumption
Not verified in the catalogue
Connectors
AC: Type 2 · DC: CCS
Documented configuration
2026
Configuration market
United Kingdom
Market status
Check availability in your country

Source market: United Kingdom. Check availability, year and equipment in your country.

Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.

Indicative usable capacity: the source states capacity without certifying it as net here; energy, time and cost may be overestimated. Declared battery capacity 112 kWh, AC 11/DC 350 kW. The Italian text incorrectly abbreviates capacity as kW; the UK page confirms the unit. No net capacity of 106 kWh is inferred.

AC charging time from 20–80%

Energy stored in this window is approximately 67.2 kWh. With 10% losses, estimated supply energy is 74.7 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW32 h 28 min
3.7 kW3.7 kW20 h 11 min
7.4 kW7.4 kW10 h 06 min
11 kW11 kW6 h 48 min
22 kW11 kW6 h 48 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 10–80% in 22 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

How to use these results

A 22 kW AC station cannot exceed the onboard charger limit. For Polestar 5, the individual version figures in the table are more useful than the commercial name alone. Also check available power and installation phases.

Estimated cost multiplies supply kWh by your tariff. DC charging follows a curve and cannot be calculated by dividing energy by peak power. Sources and reference windows are listed for each version.

Other models to explore