RicaoraRicaora
CHARGING TIME AND COST

Smart #5

Choose your version and where to charge. Then calculate charging time and cost with your car already selected.

4 versions94 kWh in the catalogueSources for every version

Set up your charging session

Choose a version to see its charging limits and continue.

In the calculator you can change percentages, power, tariff and conditions. For a household socket, ask a qualified professional to check that the installation is suitable for EV charging.

How much does charging cost?

Compare batteries using your tariffs. Initial values of 0.30 and 0.65 €/kWh are examples, not offers or market averages.

Supply energy = usable capacity × charge change ÷ (1 − losses). Costs cover energy only, excluding subscriptions and other charges. Actual losses vary with power, installation and temperature.

Example from 20–80%, with assumed losses of 10%.

Session energy and cost for each battery
VersionEstimated supply energyHomePublic
#5 BRABUS 100 AC22 202662.67 kWh18.80 €40.73 €
#5 Premium 100 AC22 202662.67 kWh18.80 €40.73 €
#5 Premium AWD 100 AC22 202662.67 kWh18.80 €40.73 €
#5 Pro+ 100 AC22 202662.67 kWh18.80 €40.73 €
Technical data and sources Versions, AC tables and DC references

Versions and technical data

Check your version's year and equipment. Specifications, indicative tables and sources are listed here.

#5 BRABUS 100 AC22 2026Italy · 2026 · configuration and data from the indicated source · Manufacturer-documented specifications
Usable battery capacity
94 kWh
Maximum AC power
22 kW
Maximum DC power
400 kW
Nominal/gross capacity
100 kWh
Declared WLTP range
540 km
Declared WLTP consumption
19.9 kWh/100 km
Motor and drivetrain
475 kW · All-wheel drive
Documented configuration
2026
Market status
Model marketed in Italy

Model in the Italian range. Configuration year and equipment are identified; WLTP data and times vary with equipment and conditions.

Declared AC WLTP consumption includes charging energy: do not add losses again. It is a homologation value, not a prediction of road consumption.

Italian range consulted on 15 October 2026, after Premium AWD introduction. The table distinguishes 100/94 kWh; smart UK explicitly identifies gross/net order. DC peak requires a suitable station and is not average session power. Black Collection is not duplicated as a powertrain.

AC charging time from 20–80%

Energy stored in this window is approximately 56.4 kWh. With 10% losses, estimated supply energy is 62.7 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW27 h 15 min
3.7 kW3.7 kW16 h 57 min
7.4 kW7.4 kW8 h 29 min
11 kW11 kW5 h 42 min
22 kW22 kW2 h 51 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 10–80% in 18 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

#5 Premium 100 AC22 2026Italy · 2026 · configuration and data from the indicated source · Manufacturer-documented specifications
Usable battery capacity
94 kWh
Maximum AC power
22 kW
Maximum DC power
400 kW
Nominal/gross capacity
100 kWh
Declared WLTP range
590 km
Declared WLTP consumption
18.4 kWh/100 km
Motor and drivetrain
267 kW · Rear
Documented configuration
2026
Market status
Model marketed in Italy

Model in the Italian range. Configuration year and equipment are identified; WLTP data and times vary with equipment and conditions.

Declared AC WLTP consumption includes charging energy: do not add losses again. It is a homologation value, not a prediction of road consumption.

Italian range consulted on 15 October 2026, after Premium AWD introduction. The table distinguishes 100/94 kWh; smart UK explicitly identifies gross/net order. DC peak requires a suitable station and is not average session power. Black Collection is not duplicated as a powertrain.

AC charging time from 20–80%

Energy stored in this window is approximately 56.4 kWh. With 10% losses, estimated supply energy is 62.7 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW27 h 15 min
3.7 kW3.7 kW16 h 57 min
7.4 kW7.4 kW8 h 29 min
11 kW11 kW5 h 42 min
22 kW22 kW2 h 51 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 10–80% in 18 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

#5 Premium AWD 100 AC22 2026Italy · 2026 · configuration and data from the indicated source · Manufacturer-documented specifications
Usable battery capacity
94 kWh
Maximum AC power
22 kW
Maximum DC power
400 kW
Nominal/gross capacity
100 kWh
Declared WLTP range
540 km
Declared WLTP consumption
18.9 kWh/100 km
Motor and drivetrain
432 kW · All-wheel drive
Documented configuration
2026
Market status
Model marketed in Italy

Model in the Italian range. Configuration year and equipment are identified; WLTP data and times vary with equipment and conditions.

Declared AC WLTP consumption includes charging energy: do not add losses again. It is a homologation value, not a prediction of road consumption.

Italian range consulted on 15 October 2026, after Premium AWD introduction. The table distinguishes 100/94 kWh; smart UK explicitly identifies gross/net order. DC peak requires a suitable station and is not average session power. Black Collection is not duplicated as a powertrain.

AC charging time from 20–80%

Energy stored in this window is approximately 56.4 kWh. With 10% losses, estimated supply energy is 62.7 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW27 h 15 min
3.7 kW3.7 kW16 h 57 min
7.4 kW7.4 kW8 h 29 min
11 kW11 kW5 h 42 min
22 kW22 kW2 h 51 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 10–80% in 18 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

#5 Pro+ 100 AC22 2026Italy · 2026 · configuration and data from the indicated source · Manufacturer-documented specifications
Usable battery capacity
94 kWh
Maximum AC power
22 kW
Maximum DC power
400 kW
Nominal/gross capacity
100 kWh
Declared WLTP range
590 km
Declared WLTP consumption
18.4 kWh/100 km
Motor and drivetrain
267 kW · Rear
Documented configuration
2026
Market status
Model marketed in Italy

Model in the Italian range. Configuration year and equipment are identified; WLTP data and times vary with equipment and conditions.

Declared AC WLTP consumption includes charging energy: do not add losses again. It is a homologation value, not a prediction of road consumption.

Italian range consulted on 15 October 2026, after Premium AWD introduction. The table distinguishes 100/94 kWh; smart UK explicitly identifies gross/net order. DC peak requires a suitable station and is not average session power. Black Collection is not duplicated as a powertrain.

AC charging time from 20–80%

Energy stored in this window is approximately 56.4 kWh. With 10% losses, estimated supply energy is 62.7 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW27 h 15 min
3.7 kW3.7 kW16 h 57 min
7.4 kW7.4 kW8 h 29 min
11 kW11 kW5 h 42 min
22 kW22 kW2 h 51 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 10–80% in 18 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

How to use these results

A 22 kW AC station cannot exceed the onboard charger limit. For Smart #5, the individual version figures in the table are more useful than the commercial name alone. Also check available power and installation phases.

Estimated cost multiplies supply kWh by your tariff. DC charging follows a curve and cannot be calculated by dividing energy by peak power. Sources and reference windows are listed for each version.

Other models to explore