RicaoraRicaora
CHARGING TIME AND COST

Toyota bZ4X Touring

Choose your version and where to charge. Then calculate charging time and cost with your car already selected.

2 versions71 kWh in the catalogueSources for every version

Set up your charging session

Choose a version to see its charging limits and continue.

In the calculator you can change percentages, power, tariff and conditions. For a household socket, ask a qualified professional to check that the installation is suitable for EV charging.

How much does charging cost?

Compare batteries using your tariffs. Initial values of 0.30 and 0.65 €/kWh are examples, not offers or market averages.

Supply energy = usable capacity × charge change ÷ (1 − losses). Costs cover energy only, excluding subscriptions and other charges. Actual losses vary with power, installation and temperature.

Example from 20–80%, with assumed losses of 10%.

Session energy and cost for each battery
VersionEstimated supply energyHomePublic
bZ4X Touring 71 net AC11 Europe 202647.33 kWh14.20 €30.77 €
bZ4X Touring 71 net AC22 Europe 202647.33 kWh14.20 €30.77 €
Technical data and sources Versions, AC tables and DC references

Versions and technical data

Check your version's year and equipment. Specifications, indicative tables and sources are listed here.

bZ4X Touring 71 net AC11 Europe 2026bZ4X Touring 71 net AC11 Europe 2026 · 2026 · Manufacturer-documented specifications
Usable battery capacity
71 kWh
Maximum AC power
11 kW
Maximum DC power
150 kW
Nominal/gross capacity
74.7 kWh
Declared WLTP range
Not verified in the catalogue
Declared WLTP consumption
Not verified in the catalogue
Documented configuration
2026
Market status
Check availability in your country

Source configuration and market are identified; check your vehicle year and equipment.

Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.

European technical charging profile: 71 kWh net / 74.7 gross. The source confirms trim-dependent OBC 11/22 without mapping every charger to every drivetrain; undocumented FWD/AWD combinations are not created. Check your trim.

AC charging time from 20–80%

Energy stored in this window is approximately 42.6 kWh. With 10% losses, estimated supply energy is 47.3 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW20 h 35 min
3.7 kW3.7 kW12 h 48 min
7.4 kW7.4 kW6 h 24 min
11 kW11 kW4 h 19 min
22 kW11 kW4 h 19 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 10–80% in 28 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

bZ4X Touring 71 net AC22 Europe 2026bZ4X Touring 71 net AC22 Europe 2026 · 2026 · Manufacturer-documented specifications
Usable battery capacity
71 kWh
Maximum AC power
22 kW
Maximum DC power
150 kW
Nominal/gross capacity
74.7 kWh
Declared WLTP range
Not verified in the catalogue
Declared WLTP consumption
Not verified in the catalogue
Documented configuration
2026
Market status
Check availability in your country

Source configuration and market are identified; check your vehicle year and equipment.

Internal calculator estimates are not shown as WLTP consumption or range. These data will be added after the exact version is verified.

European technical charging profile: 71 kWh net / 74.7 gross. The source confirms trim-dependent OBC 11/22 without mapping every charger to every drivetrain; undocumented FWD/AWD combinations are not created. Check your trim.

AC charging time from 20–80%

Energy stored in this window is approximately 42.6 kWh. With 10% losses, estimated supply energy is 47.3 kWh.

Available powerApplied limitEstimated time
2.3 kW2.3 kW20 h 35 min
3.7 kW3.7 kW12 h 48 min
7.4 kW7.4 kW6 h 24 min
11 kW11 kW4 h 19 min
22 kW22 kW2 h 10 min

Simplified estimate: stored energy ÷ 0.90 ÷ effective power. Power is the lower of available power and the version's AC limit. Constant power is assumed: installation, phases, temperature and battery management can extend time. Listed powers are calculation scenarios, not an installation assessment.

Rapid DC charging

The catalogue reports a reference of 10–80% in 28 minutes. This reference applies to the stated version and source conditions; it is not a guaranteed time for every session. The full calculator uses it as a reference for the estimated curve.

Sources and version

How to use these results

A 22 kW AC station cannot exceed the onboard charger limit. For Toyota bZ4X Touring, the individual version figures in the table are more useful than the commercial name alone. Also check available power and installation phases.

Estimated cost multiplies supply kWh by your tariff. DC charging follows a curve and cannot be calculated by dividing energy by peak power. Sources and reference windows are listed for each version.

Other models to explore